Electrification permit package
One-line diagram, load calculation, site plan, labels and the filled permit form for EV chargers, service and panel upgrades, standby generators and home batteries. Pick one item or bundle several on the same job.
Start an orderWhat you get
- Cover sheet with scope, code edition and general notes
- Site plan with equipment locations, meter, panel and run route
- Single-line diagram with conductor, conduit, OCPD and grounding sizes
- Load calculation (NEC 220.82/220.83, CEC 8-200, AS/NZS 3000 Appendix C or BS 7671 diversity, by country)
- Equipment schedule and spec sheets
- Required labels and placards
- Filled permit application, ready to sign
Typical turnaround: 2 business days after we have everything. Drafted to the code edition your permit office uses (US, Canada, Australia and the UK).
Pricing
| Electrification package (first item) | Ask us |
| Each additional item on the same job | Ask us |
| Rush | Ask us |
Permit office fees are separate and paid to the permit office.
What we need from you
- Site address and property owner name
- What is being installed?
- Electric utility
- Service voltage
- Existing service / main breaker (A)
- Existing main panel make and model
- Conditioned floor area (sq ft or m², say which)
- Major existing loads (range, dryer, A/C or heat pump, water heater, hot tub, other EVs)
- Main heating type
Photos and documents
- Utility meter (number readable)
- Main panel label (bus and main breaker rating)
- Main panel with the cover off (breakers visible)
- Where the new equipment will go
- Rough site sketch with the run route (photo of a sketch is fine) (optional)
- Spec sheets for the new equipment (optional)
