Utility interconnection application
We fill out and file the utility interconnection (and net metering / export) application for solar, battery and generator jobs, using your plan set, then track it until the utility gives permission to operate. Utility fees are billed back at cost.
Start an orderWhat you get
- Completed utility application (and net metering / export agreement)
- One-line and site plan formatted to the utility's rules
- Equipment certification list (UL 1741 / IEEE 1547, CSA C22.2 No. 107.1, AS/NZS 4777 or G98/G99, by country)
- Customer signature packet (e-sign where the utility allows)
- Status tracking until permission to operate
Typical turnaround: 2 business days after we have everything. Drafted to the code edition your permit office uses (US, Canada, Australia and the UK).
Pricing
| Interconnection application | Ask us |
| Rush | Ask us |
Permit office fees are separate and paid to the permit office.
What we need from you
- Site address and property owner name
- Electric utility / distribution network operator
- Utility account number (or NMI / MPAN)
- Meter number
- Application type
- Inverter nameplate, kW AC
- Inverter make, model and quantity
- Export
- Customer email for the utility's e-signature
Photos and documents
- Plan set or one-line diagram
- Recent utility bill (page with account and meter number)
- Inverter / battery spec sheets (optional)
- Signed customer authorization (if you already have it) (optional)
